| To put it simply, Virtual 3-D Simulation = Time + Cost Savings |
 |
| At Larvik, we incorporate the physical, logical and operational parameters of a system into a single process analysis tool. The result is the creation of a Virtual Facility that enables you to |
|
 |
Determine accurately measures of performance such as throughput, utilization, inventory and lead |
| |
time |
 |
Evaluate material handling requirements |
 |
Balance work assignments |
 |
Schedule manpower and equipment |
 |
Determine impact of production schedules, receipts and dispatches |
 |
Analyze the impact of process variability (downtime, set-ups, rejects) on flow |
 |
Justify capital expenditure, especially when investing in automation |
|
| |